Terms and privacy
How our promises work.
This page explains the promises on this website in plain words. Your signed quotation and contract set the exact terms for your bathroom. If anything here differs from your contract, your contract applies.
- Prices
- Working days and finish date
- Late-day credit
- Warranty
- Payments
- Design visit and pictures
- Privacy
- General
Prices
- The starting prices on this website and the price range in the online check are a guide for a typical bathroom. They are not a quote.
- Your fixed price is set in a written quotation after the design visit. It includes VAT and is valid for 14 days.
- The fixed price covers the work, sizes and products listed in your quotation. It changes only through a change order that you sign, which shows the cost and any change to the finish date.
- If we find hidden damage or problems once the old bathroom is stripped out (for example damaged pipes or drains, cracks, weak walls or floors, or earlier work that was not done properly), we stop, send you photos and price the repair. Nothing is added to your price without your signed approval.
- Fees charged by your building, community, developer or landlord (for example NOC, access or deposit fees) are not included unless your quotation lists them.
- Products are subject to availability. If a product is discontinued or delayed, we offer you an equal alternative and use it only with your approval.
Working days and finish date
- All times we give are in working days. Working days are Monday to Saturday, not counting UAE public holidays.
- We can work on a Sunday or a public holiday if you ask and your building allows it. A rush fee applies, which we agree with you in writing first.
- The times on this website (for example about 12 working days on site for a standard Leak-Proof Rebuild) are typical for a standard bathroom. They are not a promise for yours. Your own finish date is written in your contract.
- The working-day count begins on the start date in your contract. We confirm that start date once the contract is signed, the first payment is received, any building or landlord approval (NOC) is in hand, and your materials are ready, including made-to-measure items such as vanities, stone counters and special-order products.
- Shower glass and some made-to-measure items can only be measured after tiling. If they are not ready by handover, we fit them on a short return visit. This does not count as late.
- The finish date moves by the time lost when:
- you ask for changes, or choices, approvals, access or payments come later than agreed;
- we cannot get into the home, or the building limits working hours, lifts, parking or noisy work;
- approvals from your landlord, building, community or the authorities take longer than expected;
- hidden damage or conditions found after strip-out need extra work;
- items you supply, or special-order products you chose, are delayed by the supplier or maker;
- water or power is not available, or other contractors or building maintenance get in the way;
- holidays announced after signing, government directions, extreme weather or other events outside our reasonable control.
- When the finish date moves, we tell you in writing (WhatsApp counts) with the new date and the reason.
Late-day credit
- If we hand over after the finish date in your contract, as moved under the section above, for reasons within our control, we credit AED 100 for each working day late.
- The total credit is capped at 5% of your project value.
- The credit is taken off your final payment. It is not paid in cash and cannot be exchanged for anything else.
- Handover means the bathroom is finished and usable and we have done the snag walk with you. Fixing small snag items afterwards, and return visits for glass or made-to-measure items, do not count as late days.
- The credit applies when your payments are up to date, and only to jobs with a contract signed with Sana City Technical Contracting LLC that shows a finish date.
- As far as the law allows, this credit is the full and only compensation for finishing late.
Warranty
- 5-year leak-free warranty. In a Leak-Proof Rebuild, we cover leaks caused by the waterproofing we install, within the area we renovated, for 5 years from handover. We repair the leak and make good the area we open.
- 12 months on workmanship for every job, from handover.
- Products such as taps, toilets, cisterns, mirrors and lights carry their makers' warranties. We help you make the claim.
- The warranty does not cover:
- a Refresh, where the floor and walls are not stripped and re-waterproofed (the 12 months on workmanship still applies);
- pipes, drains, walls and fittings outside the area we worked on, or existing pipes we did not replace;
- blocked drains, misuse, impact damage or damage from harsh cleaning chemicals;
- silicone, grout and sealant upkeep, and normal wear and tear;
- movement, settling or cracks in the building structure;
- work by others after handover, including drilling into tiled walls or floors;
- water coming from somewhere else, such as a flat above, an AC drain or the roof.
- Your warranty certificate is issued at handover and starts once the final payment is made.
- To make a claim, send us photos and a short note on WhatsApp. We arrange an inspection and, if the problem is covered, repair it at no cost.
Payments
- A Leak-Proof Rebuild is paid in four stages: 50% on signing (less the AED 500 design-visit fee); 35% when the flood test passes, before tiling starts; 10% when tiling is done, before your fixtures are delivered and fitted; and 5% at handover. Your contract sets the exact amounts.
- A Refresh is paid 50% on signing, 35% before your fixtures are delivered, 10% once they are fitted and before the glass and final finishing, and 5% at handover.
- Each payment is due within 2 working days of our invoice, and before the next stage starts. You can pay by bank transfer or card.
- If a payment is late, we pause the work and the finish date moves by the days lost. Products not yet fitted stay in our store until the payment is received.
- If a payment is still unpaid 7 days after a written reminder, we may end the contract and invoice the work done and the materials bought or ordered for you.
- Everything we supply remains the property of Sana City Technical Contracting LLC until it is paid for in full.
Design visit and pictures
- The design visit costs AED 500. If you sign within the 14 days your quotation is valid, the fee comes off your first payment. Otherwise it is not refundable.
- Pictures, 3D views and designs on this website and in the SanaBath Design Studio are illustrations. Colours, sizes and finishes of real products can differ. Your quotation lists the exact products we will fit.
Privacy
- When you use the price check or the Design Studio, we collect your answers, your name and your phone number. We use them to give you a price, contact you about your bathroom and improve our service.
- We do not sell your details. We share them only with people who help us run SanaBath (for example our hosting and messaging providers), and only for that purpose.
- We use advertising and analytics tools from Meta and Google to see which ads bring people to us.
- Your answers are also kept in your own browser so you do not lose your progress. You can clear them in your browser settings.
- To see, change or delete the details we hold about you, message us on WhatsApp at +971 55 577 2770 or email hello@sanabath.ae.
General
- SanaBath and SANACO are brand names. The company you contract with, and that gives every promise on this page, is Sana City Technical Contracting LLC, P.O. Box 3167, Sharjah, United Arab Emirates, as named on its trade licence.
- These terms summarise how we work. Your signed quotation and contract set the terms for your job, and they apply if anything here differs.
- Nothing here limits rights you have under UAE law that cannot be limited.
- These terms are governed by the laws of the Emirate of Sharjah and the UAE.
- We may update this page. The version in force on the date you sign your contract applies to your job.
Last updated 17 November 2026.