Bathroom renovation · Sharjah, Dubai, Ajman

Bathroomsdone right.No surprises.

One fixed price. A finish date in your contract. And every bathroom floor flood-tested for 24 hours before a single tile goes down.

See how we build
  • Fixed price*
  • Finish date in writing*
  • 24-hour flood test
  • 5-year leak-free warranty*
Scroll to watch us build it

Behind the tiles

This is what a bathroom that never leaks takes.

A standard Leak-Proof Rebuild takes about twelve working days on site*. Keep scrolling and watch one go up, step by step.

Day 101 / 07

Protect and strip out

We cover the route through your home, then take the room back to bare walls and slab. Nothing old stays hidden behind the new.

Photos of the bare room on WhatsApp the same day

Days 2 and 302 / 07

New pipes, pressure-tested

New supply and drainage inside the bathroom, laid where your design needs them. Every joint is pressure-tested before anything gets covered.

No old pipe left behind a new wall

Day 403 / 07

Waterproofing, two coats

Corners and pipe exits are taped first. Then two coats of membrane over the whole floor, up every wall, and full height inside the shower.

The line under "bath" in our logo is this layer

Day 504 / 07

The 24-hour flood test

We fill the floor with water and leave it for a full day. If the level hasn't moved, it passes. You get the video before any tile goes down.

Days 6 to 905 / 07

Screed and tile

A screed that falls gently to the drain, then your tiles, laid level and grouted exactly as on the finish sheet you signed.

Tiles from the samples you chose, nothing swapped

Day 1006 / 07

Fixtures, glass and lights

Wall-hung toilet, vanity, mixers, shower glass, mirror and lights go in, and every one is run and tested.

Brands we trust: RAK Ceramics, BAGNODESIGN, Geberit

Days 11 and 1207 / 07

Glass, clean and hand over

We walk it with you, close every snag, and hand over your warranty certificate: 5 years leak-free, 12 months on workmanship*.

Why SanaBath

What usually goes wrong, and what we do instead.

Most bathroom renovations go wrong in the same five places. We built our whole process around closing them, and we put each one in writing.

01The price grows once the walls are open.One fixed price, signed before we start. It changes only if you sign a change.
02The finish date slips, then slips again.The finish date is in your contract, with AED 100 back for every late working day*
03A leak shows up in the flat below, months later.Every floor is flood-tested for 24 hours before we tile.
04Nobody tells you what is happening.Photos on WhatsApp every working day.
05More money asked for mid-job, with nothing to show for it.Four payments, fixed in your contract. Each one after you have seen the stage before it.*

Inside the wall

Seven layers. You only ever see one.

The tile is the part you choose. The layers behind it decide whether your bathroom lasts. We never skip one, and we photograph each for you.

See the line under "bath"? That's the waterproofing. It's in our name because it's the one thing we never cut corners on.

Prices

Two ways to a new bathroom.

Both start with a design visit and end with a price fixed in writing. The difference is what happens behind the tiles.

Your tiles stay

Refresh

For a bathroom that works but looks tired. No leaks, no cracked tiles.

Standard bathroom, from
AED 12,075incl. VAT
  • New toilet, basin, mixers and shower set
  • Fresh grout and new silicone throughout
  • New valves and hoses
  • Ceiling paint and a deep clean
2 to 5Working days on site
12 monthsWorkmanship warranty
Fixes leaks for good

Leak-Proof Rebuild

Strip to the walls and build it right: new pipes, new waterproofing, new everything.

Standard bathroom, from
AED 22,050incl. VAT
  • Stripped back to the walls and slab
  • New supply and drainage, pressure-tested
  • Two-coat membrane and a 24-hour flood test
  • New tiles, fixtures, glass and lights
About 12*Working days on site
5 years*Leak-free warranty
12 monthsWorkmanship
Starting prices by bathroom, including VAT
Starting prices, incl. VATGuest WCStandard bathroomMaster or villa
RefreshAED 8,400AED 12,075AED 15,225
Leak-Proof RebuildAED 14,700AED 22,050AED 31,500

Starting prices cover a standard scope with mid-range tiles and fittings. Designer brands and large-format tiles cost more. Your price is fixed in writing after the design visit and changes only if you sign a change*.

Our promise

In writing, not just in words.

5years

Leak-free*

On the waterproofing we install in every Leak-Proof Rebuild.

12months

Workmanship

On everything we fit, in every job.

AED100

For every late working day*

Taken off your final payment if we finish after the date in your contract for reasons in our control.

Daily

Photos on WhatsApp

Every working day, and the flood-test video before any tile goes down.

The full terms are in your contract and on the warranty certificate you receive at handover. How our promises work.

How it works

From first message to finished bathroom.

01

Two-minute check

A few quick questions online. You see a typical price for your bathroom straight away.

Today, 2 minutes
02

A 15-minute call

A SanaBath designer calls to understand your bathroom, your budget and your timing.

Within working hours
03

Design it in our Studio

You get a private link to the SanaBath Design Studio. Choose your look and see the price as you go.

By invitation
04

Design visit

We measure, check your pipes and drains, and bring samples of exactly what you chose. AED 500, taken off your price when you sign.

At your home
05

Fixed price and finish date

One price and one finish date, in writing, with a finish sheet of every tile and fitting.

Quote valid for 14 days
06

We build it

About 12 working days on site for a standard bathroom, with photos on WhatsApp every working day and the flood-test video before we tile.

Once materials are ready
07

Handover and warranty

We walk it with you, fix every snag, and hand over your warranty certificate.

On the date in your contract

SanaBath Design Studio

Design it yourself, before we touch a tile.

After your call you get a private link to our Design Studio. Pick your look, tiles, fittings and lights, and watch your bathroom and its price change with every choice.

  • See it as you chooseThe drawing of your bathroom updates with every answer.
  • Know the cost as you goA cost meter moves from low to high as you choose.
  • Decide togetherYou and your partner answer on your own phones and see where you agree.
  • Bring it to the visitWe arrive with samples of exactly what you picked.

By invitation, after a short call. Your design stays private.

The SanaBath Design Studio: a drawing of the bathroom with tile, fitting and colour choices and a live cost meter

Start from a look

Eight looks in the Studio. Make any of them yours.

Clean whiteBright white
Warm JapandiSoft beige
Signature MarbleMarble walls
Dark luxeCharcoal
Classic elegantCream tones
Soft neutralGreige ceramics
Urban concreteConcrete grey
Stone spaStone

Payments

See each stage. Then pay for the next.

Four payments, fixed in your contract. Each one falls due only after you have seen the stage before it done, and before the next one starts.* Pay by bank transfer or by card. A tax invoice for every payment.

50%

On signing

Less the AED 500 design-visit fee you have already paid. It books your start date and orders all your materials.

35%

After the flood test

Due once the floor has held water for 24 hours, on video, and before we start tiling.

10%

Tiles laid

Due once your tiles are down, before we deliver and fit your toilet, vanity, mixers and glass.

5%

At handover

After the snag walk. Any late-day credit* comes off this one.

Where we work

Sharjah, Dubai and Ajman. And across the UAE.

  • Sharjah Our home since 1988
  • Dubai Core area
  • Ajman Core area
  • Rest of the UAE Ask us
Abu Dhabi Dubai Sharjah Ajman Umm Al Quwain Ras Al Khaimah Fujairah

Questions

Straight answers.

Anything else, ask us on WhatsApp.

How much does a bathroom renovation cost?

A Refresh of a standard bathroom starts at AED 12,075 and a Leak-Proof Rebuild at AED 22,050, both including VAT. Your exact price depends on size, layout and the tiles and fittings you choose. It is fixed in writing after the design visit.

How long will my bathroom be out of use?

A standard Leak-Proof Rebuild takes about 12 working days on site, a guest WC about 8 and a villa master about 16. A Refresh takes 2 to 5. Working days are Monday to Saturday, not counting UAE public holidays. Need us on a Sunday? We can, for a rush fee.

We start once your materials are ready, so made-to-measure pieces such as vanities and stone counters are made before we arrive. Shower glass is measured after tiling; if it is not ready by handover, we fit it on a short return visit. Your own finish date is written into your contract. If it is your only bathroom, we keep the toilet usable where we can.

What is the difference between a Refresh and a Leak-Proof Rebuild?

A Refresh keeps your tiles and the waterproofing behind them: new fittings, grout, sealant and paint. A Rebuild strips the room to the walls and slab and replaces the pipes, waterproofing and tiles. If you have leaks, damp or cracked tiles, only a Rebuild fixes them.

Do I need permission from my building?

Most buildings ask for a no-objection letter from management before work starts. We fill in the building letter for you; you sign it and send it in. Your start date is confirmed once it is approved and your materials are ready.

What if you find damage behind the old tiles?

We stop, send you photos, and price the repair before we do it. Nothing is added to your price without your signed approval, and the finish date moves by the days the repair needs.

I rent my home. Can I still renovate?

Yes, with your landlord's agreement in writing. We draft the permission letter for you to send. Without it we cannot start.

What does the warranty cover?

Every Leak-Proof Rebuild carries a 5-year leak-free warranty on the waterproofing we install, and every job carries 12 months on workmanship. Products carry their makers' warranties. What is and isn't covered.

How do the payments work?

In four steps: 50% when you sign, less the AED 500 design-visit fee; 35% once the floor passes the 24-hour flood test, before tiling starts; 10% once your tiles are laid, before we deliver and fit your fixtures; and the last 5% at handover, after the snag walk. Each payment is due before the next stage starts. Pay by bank transfer or by card, and every payment gets a tax invoice. Payment terms.

Which brands do you use?

The names you already know: RAK Ceramics, BAGNODESIGN, GROHE, hansgrohe, Duravit, TOTO, Ideal Standard and Geberit for sanitaryware and fittings, and MAPEI, LATICRETE, Terraco and Sika for waterproofing and adhesives. Our first picks are RAK Ceramics and BAGNODESIGN, and we keep each bathroom to three brands at most so the finishes match.

Who is behind SanaBath?

SanaBath is the bathroom renovation brand of Sana City Technical Contracting LLC, known as SANACO, a Sharjah contractor that has built, fitted out and maintained homes and buildings across the UAE since 1988.

Two-minute check

Find out what your bathroom will cost.

A few quick questions. You see a typical price for your bathroom straight away, and a SanaBath designer follows up on WhatsApp.

The brands we fit

38 years of fitting the names you already trust.

SANACO has built and fitted out homes, villas and buildings across the UAE since 1988, working with these brands for sanitaryware, fittings, tiles, waterproofing and adhesives. Your finish sheet names the exact products in your bathroom.

Sanitaryware and fittings

  • GROHE
  • RAK Ceramics
  • BAGNODESIGN
  • Duravit
  • TOTO
  • Ideal Standard
  • hansgrohe
  • Geberit
  • Villeroy & Boch
  • Kohler
  • Roca
  • Milano
  • Jaquar

Tiles, waterproofing and adhesives

  • MAPEI
  • LATICRETE
  • Terraco
  • Sika
  • Fosroc
  • Weber
  • RAK Ceramics
  • Schlüter-Systems
  • Geberit

Brand names are trademarks of their owners, shown to describe products we install. SANACO is not an official dealer or appointed partner of these brands unless your quotation says so.